arx

Kéntro Tower Unit Finishing

May 23, 2026
20 min read
Kéntro Tower Unit Finishing

Finishing is what separates a property ready for operation from one that needs additional investment and long waiting.

In the world of real estate investment in the New Administrative Capital, Kéntro Tower stands out with luxury finishing standards making it ready for use or rental from day one of delivery.

As ARX Development, we present in this guide precise details about the finishing specifications of Kéntro Tower so you know exactly what you'll receive upon delivery.

The full finishing in Kéntro is not just an additional advantage it's a complete design philosophy that saves you 15-25% of additional finishing costs and accelerates your investment return.

Finishing Standards in Kéntro

ARX applies global finishing standards to Kéntro matching the highest specifications in the Egyptian and regional markets.

Main standards in Kéntro finishing:

1. Global ISO quality standards in material selection.

2. Compliance with the Egyptian Building Code (ECP).

3. Minimum long-term maintenance costs.

4. Environmental sustainability and energy efficiency.

5. Architectural aesthetics per YBA's vision.

6. Flexibility to accommodate multiple activities.

7. Safety and security per global standards.

8. Acoustic and thermal efficiency.

What the Full Finishing Includes

Upon delivery of your Kéntro unit, you receive a fully ready unit including:

  • Floors finished with high-quality materials.

  • Interior walls painted with luxury paints.

  • Ceilings painted and ready for lighting.

  • Interior and exterior doors with security locks.

  • Windows with thermal and sound-insulating glass.

  • Central A/C fully distributed.

  • Modern LED lighting throughout all spaces.

  • Bathrooms with luxury sanitary fixtures.

  • Electrical and internet points throughout all spaces.

  • Drainage and water system ready for operation.

This means once you receive the keys, you can start operation or rental without any delay.

Finishing by Unit Type

Unit finishing slightly varies by type to meet each activity's needs:

  • Commercial units (ground and first): finishing ready for commercial setup with elegant glass façades.

  • Administrative units (floors 2-15): practical office finishing with flexible partitions.

  • Medical units (clinics): finishing meeting medical activity requirements.

In all cases, finishing is ready for immediate use upon delivery.

For the complete project profile, see Kéntro Tower New Administrative Capital.

Construction and Finishing Materials

Finishing quality depends on the quality of materials used — and in Kéntro, we use elite global and local materials.

Floors and Walls

Floors and walls in Kéntro achieve a balance between luxury and durability:

  • Main space floors: natural marble or luxury porcelain, scratch-resistant.

  • Bathroom floors: slip-resistant ceramic to global standards.

  • Interior walls: luxury plastic paints, stain-resistant.

  • Exterior walls: alucobond and glass with high specifications.

  • Ceilings: treated with sound and heat insulating materials.

Doors and Windows

Windows and doors are among the most impactful elements on comfort and security:

  • Exterior doors: secure metal with multi-level locks.

  • Interior doors: luxury wood with professional handles.

  • Windows: double glass insulating heat and sound.

  • Frames: rust-resistant and weather-resistant aluminum.

  • Wide windows: for maximum natural lighting.

Air Conditioning and Heating

The central A/C system in Kéntro is among the latest available systems:

  • Comprehensive central A/C for all units.

  • Smart temperature control for each room.

  • High energy efficiency with low consumption rates.

  • Periodic maintenance handled by the management company.

  • Equal distribution of cool air throughout the unit.

Electrical and Sanitary Finishing

Electrical and sanitary systems are designed to strict standards:

  • Electrical systems: switches and outlets from global brands.

  • Lighting: modern energy-saving LED throughout all spaces.

  • Internet points: distributed in all spaces with high speeds.

  • Sanitary fixtures: luxury from trusted global brands.

  • Plumbing fixtures: advanced thermal mixers.

  • Drainage: advanced system to high health standards.

Smart Systems in Units

Kéntro is not just a traditional building — it's a smart building integrating the latest technologies to ease your life.

Smart systems in Kéntro:

1. Smart A/C control system for each room.

2. Programmable smart lighting system.

3. Advanced security system with surveillance cameras and motion sensors.

4. Secure access system for the building and units (cards or biometric).

5. High-speed Wi-Fi network covering the entire building.

6. Central Building Management System (BMS) for monitoring all systems.

7. Fire alarm and automatic suppression system.

8. Notification and alert system for owners via apps.

Smart System Advantages for Investors

Smart systems raise your investment value from 4 aspects:

  • Attracting tenants from higher economic segments who value technology.

  • Reducing long-term maintenance costs.

  • Rationalizing energy consumption (electricity and water).

  • Competitive advantage upon resale.

Infrastructure Readiness

Kéntro is equipped with complete modern infrastructure:

  • Fiber network for high-speed internet ready for operation.

  • Electrical network with high capacity.

  • Smart garage system with 4 basements.

  • Communications and landline network.

  • Smart fire and emergency system.

  • Fast elevators with smart control systems.

For deeper details about Kéntro investment advantages, see Best Investment Opportunities in Egypt.

Comparison with Market Level

To appreciate the value of Kéntro's finishing, we need to compare it with finishing levels of similar market projects.

Delivery Standards in the Market

Most projects in the New Administrative Capital fall into 3 delivery categories:

  • Core & Shell: unit without any finishing — owner needs to spend 15-25% of unit price on finishing.

  • Semi-finished: basic finishing without A/C or lighting — needs additional 8-15%.

  • Full finishing: ready for immediate operation — no additional costs.

Kéntro belongs to the third category — full finishing.

Financial Difference for Investors

Take an example: 60 sqm office at EGP 4,830,000:

  • In competing projects (semi-finished): you spend additional EGP 580,000-720,000 on finishing.

  • In Kéntro (full finishing): you spend nothing additional — final price.

  • Actual difference: saving EGP 580K-720K + 3-6 months finishing time.

This means Kéntro's actual price is lower than competitors despite the announced price appearing similar.

Time Difference for Investors

Full finishing also saves you time:

  • In competing projects: 3-6 months finishing after delivery.

  • Search for trusted contractors and follow up on their work.

  • Struggle with delays and budget overruns.

  • Delayed start of operation or rental.

  • In Kéntro: receive the keys and start operation immediately.

This saved time means additional returns equivalent to 3-6 months of rentals.

For deeper analysis of investment areas, see Best Areas for Real Estate Investment in Egypt.

Delivery Schedule

Kéntro units are currently under construction, and the project follows a defined and studied timeline.

Kéntro execution phases:

1. Phase 1: foundation and basement work (completed).

2. Phase 2: building structural skeleton (under execution).

3. Phase 3: building work and interior partitions.

4. Phase 4: electrical, sanitary, and mechanical work.

5. Phase 5: final finishing and installations.

6. Phase 6: final delivery to owners.

Commitment to Deadlines Guarantee

ARX with 150+ delivered project record guarantees deadline commitment:

  • Strong financial standing (EGP 8B+) ensures continued execution.

  • Not relying entirely on buyers' money.

  • Partnerships with certified contractors with quality records.

  • Periodic follow-up from project senior management.

  • Clear contract clauses for developer delay penalties.

  • Complete transparency with buyers about construction progress.

What Happens After Delivery

Delivery isn't the end of the relationship — it's its beginning:

  • Unit inspection before signing the delivery report.

  • Quality warranty on finishings for a specified period.

  • Russell Saudi Arabia management work commencement.

  • Periodic follow-up for maintenance and services.

  • Support if you wish to rent.

To explore complete payment plans, see Installment Plans.

 

Frequently Asked Questions

1. Are Kéntro units fully finished?

Yes, all Kéntro units are delivered with full finishing including: finished floors and walls, central A/C, LED lighting, luxury sanitary fixtures, security doors, insulating windows, electrical and internet points. This means you'll receive your unit ready for immediate operation or rental without any additional finishing costs.

2. What's the finishing quality in Kéntro?

Finishing quality in Kéntro is among the highest standards in the Egyptian market. We use: natural marble or luxury porcelain for floors, luxury plastic paints, secure metal doors, double-glazed insulating windows, modern central A/C, LED lighting. All under YBA's architectural supervision. Quality matches global ISO standards.

3. When does delivery start in Kéntro?

Units are currently under construction following a defined timeline. ARX with 150+ delivered project record commits to delivery dates thanks to its strong financial standing (EGP 8B+). To get precise expected dates for your unit's delivery, contact via WhatsApp +201001703888.

4. Can finishing be modified upon request?

Basic finishing is fixed to ensure project quality, but early-booking buyers can contact the sales team to discuss specific needs (minor modifications in colors or some finishings). For commercial units, business-specific equipment can be coordinated. For details, call 16591.

5. What's the difference between full finishing and core & shell?

Core & Shell means delivering the unit with concrete structure only without any finishing you need to spend 15-25% of unit price on finishing and wait 3-6 months. Full finishing (in Kéntro) means delivering a unit ready for operation without additional costs or waiting. The financial and time difference is very significant for investors.

6. Are A/Cs included in the price?

Yes, central A/Cs are fully included in the unit price without any additional fees. The system includes: central A/C for the entire unit, smart temperature control, equal air distribution, periodic maintenance from the management company. This saves you approximately EGP 50,000-150,000 additional based on unit size.

7. Is there a warranty on finishings?

Yes, ARX provides comprehensive warranties on finishings and systems: warranty on quality of materials used, warranty on electrical and sanitary systems for a specified period, warranty on A/Cs per manufacturer terms, warranty matching the unit to what was agreed in the contract. All warranties are officially documented in the contract.

 

Conclusion

Kéntro Tower's unit finishing represents the highest standard in the New Administrative Capital market for 2026.

Summary of top strengths:

  • Full finishing to global ISO standards.

  • Luxury materials (marble, porcelain, security doors, double-glazed windows).

  • Modern central A/C included in the price.

  • 8 advanced smart systems in every unit.

  • Saving 15-25% of additional finishing costs.

  • Saving 3-6 months of finishing time.

  • Comprehensive warranties on finishings and systems.

  • Immediate readiness for operation or rental.

Your investment in Kéntro is not just buying a unit — it's buying a complete investment experience without finishing hassles.

To book in Kéntro Tower or view finishing samples, contact via WhatsApp +201001703888 — phone 16591 — or our contact page.

Related Articles

Maximize your returns

Book your unit for smart real estate investment.

Make A Decision

Let's Get In Touch

Find your next step in real estate

Contact Us Now
Whatsapp-colorCreated with Sketch.